• Twitter
  • Facebook
  • Whatsapp
  • Linkedin
  • Print
Skip to content
-
JustBureaucracy.com JustBureaucracy.com JustBureaucracy.com

15 Years of Delivering Information on PSUs, Appointments & Governance

JustBureaucracy.com JustBureaucracy.com JustBureaucracy.com

15 Years of Delivering Information on PSUs, Appointments & Governance

  • Home
  • PSU
  • Appointment
  • Governance
  • Home
  • PSU
  • Appointment
  • Governance
India

Indian Railways approves Rs. 163 Crore Electric Traction Upgradation for Parbhani-Mudkhed Section in Nanded Division of South Central Railway

By Staff Reporter
July 29, 2026 1 Min Read
0
NBCC Ad May'

Traction System Upgrade Over 164 Track Km to Handle Higher Freight Volumes and Support Running of Vande Bharat Express Trains

In a significant step towards strengthening railway infrastructure and enhancing network capacity, Indian Railways has sanctioned the upgradation of the electric traction system on the Parbhani-Mudkhed double line section in Nanded Division of South Central Railway. The project, which also includes associated power supply installation works, has been sanctioned at a cost of Rs. 163 crore.

The project involves converting the existing 1×25 kV electric traction system to a more advanced 2×25 kV system over a stretch of 164 Track Kilometres, supported by upgraded power supply infrastructure to meet the enhanced electrical load.

The Parbhani-Mudkhed section forms part of the strategically important Highly Utilised Network (HUN) Route-9, connecting Ajmer-Indore-Khandwa-Akola-Purna-Mudkhed-Secunderabad-Mahbubnagar-Dhone.

The upgraded traction system will strengthen power supply for train operations, enabling the section to handle higher freight volumes and support the running of Vande Bharat Express trains. It will also contribute to Indian Railways’ goal of achieving 3,000 Million Tonnes of freight loading by 2029-30.

The project reflects Indian Railways’ continuing efforts to modernise electrical infrastructure and improve operational efficiency on high-density corridors across the country.

Share this...
  • Facebook
  • Twitter
  • Whatsapp
  • Linkedin
  • Print

Tags:

Indian Railways
Author

Staff Reporter

Follow Me
Other Articles
Previous

PM chairs second High-Level meeting with Secretaries of Government of India

Next

Central Railway earns Rs. 34.30 Crores as Non-fare revenue in 1st Quarter of FY 2026-27

NTPC logo

LIC

LIC
Copyright 2026 — JustBureaucracy.com. All rights reserved. Blogsy WordPress Theme